Active procurement
A solicitation document will be provided when interested bidder sends a request letter along with the paid fee following the posting of the specific procurement notices.
When Request for Expressions of Interest for the consulting service assignment is posted, interested consultants shall obtain the detailed information related to the assignment only through the ADB’s Consultant Management System /CMS/ and the submission will follow using the standard Express of Interest template.
Contract no | Procurement announcement | Status | Posted on | Deadline |
---|---|---|---|---|
TRDH11-A /re-bid/ | Roads and associated utility pipelines in Tolgoit subcenter (Phase 1) | Cancelled | 2023-03-10 | 2023-04-25 |
TEC-C | Power distribution facilities and 10kV power distribution cable line for Tolgoit subcenter | Cancelled | 2023-03-09 | 2023-04-26 |
TEC-A | Telecommunication and electrical work in Tolgoit subcenter | Cancelled | 2023-03-07 | 2023-04-10 |
TRDH11-C | Water supply works in Tolgoi subcenter | Closed | 2023-01-31 | 2023-03-15 |
DAHP | DAMBADARJAA HEATING PLANT | Closed | 2023-01-26 | 2023-03-27 |
TRDH11-B | Roads, heating network, and associated infrastructure in Tolgoit subcenter (Phase 2) | Cancelled | 2023-01-17 | 2023-03-13 |
TFP-A | Flood protection and drainage in Tolgoit subcenter | Closed | 2023-01-16 | 2023-03-09 |
TRDH14-B | Roads, heating network, and associated infrastructure in Tolgoit subcenter (Section 2) | Cancelled | 2023-01-09 | 2023-02-13 |
TRDH11-A | Roads and associated utility pipelines in Tolgoit subcenter (Phase 1) | Cancelled | 2023-01-09 | 2023-02-09 |
BKHS | Construction of Bayankhoshuu square | Cancelled | 2022-12-30 | 2023-04-12 |
TEC-B | Electricity and telecommunication network in Tolgoit subcenter | Cancelled | 2022-12-30 | 2023-03-28 |
SHTL-D /re-bid/ | Green public spaces in Selbe subcenters | Cancelled | 2022-12-27 | 2023-01-27 |
SC-A | Site cleaning work for subcenter locations (Phase 1) | Closed | 2022-11-14 | 2022-11-21 |
HSSC-A | Eco-toilet system in new land areas (Phase 2) | Closed | 2022-10-04 | 2022-10-10 |
SHTSC-B /re-bid/ | 23rd khoroo of Songinokhairkhan district, GHDT-2019-1 package's "Orgil" housing project's external engineering pipeline work | Closed | 2022-08-30 | 2022-09-30 |
SHTSC-A /re-bid/ | Construction of external heating supply network in partial district area "B" near in "Tsergiin Khotkhon", 1st, 2nd, 20th khoroos of the Songinokhairkhan district. | Cancelled | 2022-08-15 | 2022-09-19 |
DAEC /re-bid/ | Electricity and telecommunication for Dambadarjaa subcenter | Closed | 2022-07-07 | 2022-08-15 |
TBC /re-bid/ | Training center in Tolgoit subcenter | Closed | 2022-04-27 | 2022-05-30 |
SHTSC-B | Design, Supply and Installation of Water supply, sewage, hot water and heating distribution network connection in Bayankhoshuu subcenter | Cancelled | 2022-04-15 | 2022-05-23 |
ASKG-DA (re-bid) | Construction of kindergarten of Dambadarjaa subcenter | Cancelled | 2022-04-11 | 2022-05-23 |
DAEC | Electricity and telecommunication for Dambadarjaa subcenter | Cancelled | 2022-04-06 | 2022-05-20 |
T3-CS03 | External environmental monitoring | Closed | 2022-03-23 | 2022-04-07 |
TBC | Training center in Tolgoit subcenter | Cancelled | 2022-03-17 | 2022-04-22 |
SHTSC-A | Water, sewage and heating secondary conncetion in Tolgoit | Cancelled | 2022-03-16 | 2022-04-20 |
SHTSC (re-bid) | Water Supply Network and Sewerage System Secondary connection (Sharkhad) and heating secondary connection (Sharkhad) /re-bid/ | Closed | 2022-03-09 | 2022-04-11 |
DARI-2 | Dambadarjaa road and associated infrastructure (Phase 2) | Closed | 2022-03-07 | 2022-04-22 |
DARI-1 | Dambadaarja road and associated infrastructure (Phase 1) | Closed | 2022-03-07 | 2022-04-22 |
FSBKH (re-bid) | Construction of fire and rescue station for Bayankhoshuu subcenter /re-bid/ | Closed | 2022-02-23 | 2022-03-29 |
ASKG-DA | Construction of kindergarten of Dambadarjaa subcenter | Cancelled | 2022-02-22 | 2022-03-28 |
FSBKH | Construction of fire and rescue station for Bayankhoshuu subcenter | Cancelled | 2021-12-24 | 2022-01-28 |