Active procurement
A solicitation document will be provided when interested bidder sends a request letter along with the paid fee following the posting of the specific procurement notices.
When Request for Expressions of Interest for the consulting service assignment is posted, interested consultants shall obtain the detailed information related to the assignment only through the ADB’s Consultant Management System /CMS/ and the submission will follow using the standard Express of Interest template.
Contract no | Procurement announcement | Status | Posted on | Deadline |
---|---|---|---|---|
BSPE | Water Supply and Sewage Pipes in Bayankhoshuu and Selbe Sub-Centers (Phase 1) | Closed | 2017-11-21 | 2017-12-11 |
BSWR10 Lot 1 | Construction of water reservoirs and supply pipes in Bayankhoshuu Sub-Centers | Closed | 2017-11-09 | 2017-12-05 |
HХААГ-17/0206 | “Сэлбэ, Баянхошуу дэд төв төслийг хэрэгжүүлэх явцад байгаль орчны хөндлөнгийн хяналт, үнэлгээ хийх” зөвлөх үйлчилгээний гэрээ | Closed | 2017-10-11 | 2017-11-30 |
BSDF07 Lot 1 | Lot-1. Flood protection and embankment (combined for culverts and embankment) Bayankhoshuu sub-center | Closed | 2017-10-11 | 2017-11-21 |
BSDF07 Lot 2 | Lot-2. Flood protection and embankment (combined for culverts and embankment) Selbe sub-center | Closed | 2017-10-11 | 2017-11-21 |
SRDH14 | Roads, heating network, and associated infrastructure in Selbe Sub-Center (Phase 2) | Closed | 2017-10-11 | 2017-11-09 |
WSNR17C | Rehabilitation of sewerage network from school 14 to the central collector on the main road | Closed | 2017-09-14 | 2017-10-11 |
BHF06 | Heating network connection to Bayankhoshuu Sub-Center | Closed | 2017-09-05 | 2018-03-09 |
T2-CS02 | Contract for Consulting Service for institutional strenghening and capacity building | Closed | 2017-08-24 | 2017-09-23 |
BRDH11 | Roads, heating network, and associated infrastructure in Bayankhoshuu Sub-Center (Phase 1) | Closed | 2017-08-24 | 2017-09-23 |
BSF05 Lot 2 | Business Incubator Vocational Training Center in Bayankhoshuu Sub-Center | Closed | 2017-08-22 | 2017-09-22 |
BSF05 Lot 1 | Kindergarten Construction in Bayankhoshuu Sub-Center | Closed | 2017-08-22 | 2017-09-19 |
WWTPR01 | Rehabilitation of Central Wastewater Treatment Plant | Closed | 2017-08-14 | 2017-09-14 |
SHF06 | Design, Supply and Installation of Heating Plant in Selbe Sub-Center | Closed | 2017-06-16 | 2017-07-17 |
CSOI | Improved Operations and Managmnet of Service Providers and Institutional and Regulatory Reform | Closed | 2017-02-04 | 2017-03-06 |
SBR08 | Three bridges in Selbe Sub-Centre | Closed | 2017-01-11 | 2017-02-13 |
WWOI | Design, Engineering, Supply and Installation of Pump Equiments, SCADA System Rehabilitation and Commissioning of Pumping Stations Water and Wastewater Treatments Plants | Closed | 2016-09-13 | 2016-10-13 |
NCB-BCM 2 | Works of sewage collector main in Bayankhoshuu sub-center | Closed | 2016-06-30 | 2016-08-29 |
NCB-BCM 1 | Sewage collector main in Bayankhoshuu sub-center | Closed | 2016-04-15 | 2016-05-15 |
NCB-SCM | Sewage collector main in Selbe sub-center | Closed | 2016-04-15 | 2016-05-15 |
CS3/CSCE | Community Engagement and Small and Medium Enterprises Development Consulting Services | Closed | 2016-04-15 | 2016-06-25 |
CS2/CSPM | Program Management Support | Closed | 2016-04-04 | 2016-06-05 |
CS4/CSSD | Improved Urban Planning and Subcenter Development Consulting Services | Closed | 2015-08-28 | 2016-08-28 |
CS1/CSDD | Detailed Engineering, Tendering and Construction, Supervision, Consulting Services | Closed | 2015-04-29 | 2015-05-29 |
ICS1-3 | International Consultants to develop TORs and design | Closed | 2014-12-01 | 2015-01-01 |
ICS4-9 | Six National Consultants to develop TORs and design | Closed | 2014-12-01 | 2015-01-01 |